ENERGY RESILIENCE IN ACTION: CCHP RECOVERY FOR A $67M UNIVERSITY VILLAGE

An off-campus facility that houses 650 students in a $67 million mixed-use village on a 34-acre parcel of land is an innovative public-private partnership between a Mississippi D-1 university and the largest apartment property manager in the U.S.

These partners, as a part of their clean energy infrastructure project, had a Combined Cooling, Heat, and Power (CCHP) system designed and installed. The goal was to operate a centralized heating and cooling plant that runs efficiently and economically, to provide HVAC and electricity to the entire complex with maximum resiliency in the event of grid failure. The energy consultants working with the partnership contacted CoolSys when the unit was inoperable at start up.

The Problem:

An in-depth inspection by CoolSys of the CCHP equipment identified areas requiring additional integrations and upgrades prior to start-up and then commissioning of the inoperable cogeneration unit. Though the partnership had numerous goals, they did not have adequate internal resources to properly maintain the new equipment and achieve their efficiency and sustainability goals.

Key Actions

  • DIAGNOSTICS & ISSUE RESOLUTION

    CoolSys CoGen specialists conducted a thorough technical assessment of the systems, pinpointing the root causes of the underperformance. From network glitches to incorrect calibrations, all issues were addressed and resolved.

  • OPTIMAL COMMISSIONING & SYSTEM UPGRADES

    CoolSys customized the system and commissioned the CCHP unit to enhance overall operability. CoolSys calibrated the infrastructure to operate in optimum balance with other critical systems, such as the absorption chiller, external radiators, and existing boilers, ensuring seamless operations and maximum energy efficiency.

  • PREVENTIVE MAINTENANCE IMPLEMENTATION

    CoolSys introduced a comprehensive preventive maintenance program covering all system components. This included regular inspections, calibration, and predictive replacements to prevent future failures.

  • 24/7/365 MONITORING & REAL-TIME RESPONSE

    A central pillar of the solution was the implementation of constant system monitoring to detect and resolve issues as they occurred. The efficacy of this approach became evident when, shortly before midnight on New Year’s Eve, a power failure disrupted four out of the six units.

    Within minutes, the monitoring team identified the issue, connected with the local technicians, and assisted the on-call shift operator in resetting the network protection. All compromised systems were restored to full functionality in under 30 minutes—a testament to the resilience of CoolSys’ solution.

The Solution

CoolSys CoGen’s expert team stepped in to address the center’s challenges, employing a multifaceted approach to assess, repair, retrofit, commission, monitor the systems 24/7/365, and maintain to prevent further outages and inefficiencies.

OPTIMIZED OPERATIONS

The CCHP system now operates at an impressive 98%+ availability year after year, while delivering more than 42,000 operational hours of resilient, efficient power to the property consistently and reliably.

IMPROVED ENERGY EFFICIENCY & COST SAVINGS

The facility reduced costs by $200,000 annually, totaling $1.2M over the 6 years the systems have been under CES care. For this reason, the client has decided to extend the agreement for an additional 5 years.

ENVIRONMENTAL IMPACT

By optimizing the system’s energy use, the off-campus student housing complex significantly reduced its greenhouse gas (GHG) emissions by 39%, reinforcing its commitment to environmental sustainability.

ELEVATED RESILIENCE

By properly calibrating and maintaining the systems, the CHP units exceeded the projections with 98 %+ resiliency. The monitoring and service played a vital role during an emergency on-site situation, ensuring students had domestic hot water, HVAC heat, and operating elevators without interruption at a crucial time.

.

The Results

The results of CoolSys CoGen’s commissioning, monitoring and service were transformational for the client organization. Addressing both the immediate and long-term inefficiencies, the facility experienced measurable improvements across key performance indicators. The success of this project strengthened the client’s trust in CoolSys. Recognizing the value and reliability delivered, the property managers have extended CoolSys’ maintenance and monitoring services for five additional years. This expansion further underlined CoolSys’ position as a trusted partner in ensuring operational excellence.

UPTIME
0 %
CHG Emissions Reduction
0 %+
Cost Reduction
$ 0 Million
Unit Operational Hours
0 +

Related Reading

CARB FRIP Program Explained

Everything you need to know about CARB FRIP 2025 program,

The Four Most Common HVAC Repairs in Commercial Heating and Cooling Services

The Four Most Common HVAC Repairs in Commercial Heating and

Commercial Cooling and Refrigeration Services for Groceries and Retail Companies

Companies across the country can benefit from the superior commercial

Upgrade EMS Or Pay The Price Later

Upgrade EMS: You’re about to lose access to EMS alerts.

Questions? Need Service?

We're Here to Help

Reach us directly for service requests at 866-417-6586, or fill out the form . Our team is ready to respond swiftly and answer any questions you may have.

Questions? Ready to Get Started?

Let’s Move Forward. Together.

Discover the advantages of aligning with the foremost authority in HVAC and refrigeration services. As a partner steeped in industry knowledge, we’re dedicated to elevating you, your team and your business. Learn More about our acquisition process and benefits, or fill out the form below.

This Website Uses Cookies.

We use Cookies to offer you a better browsing experience, analyze site traffic, personalize content, and serve targeted advertisements. More information can be found here. We do not sell or share your information with any third parties. By continuing to browse Coolsys.com you will consent to our use of cookies.