CO2 CASE STUDY: HAGERSTOWN

The Problem:

A worldwide e-commerce giant was growing its physical retail presence, transitioning from dozens of hyper-local basket-grocery stores to more than 450 organic supermarkets nationwide. To facilitate this swift growth, the company required new distribution centers capable of handling substantial orders of fresh and frozen foods, with one site located in Maryland.

Plans were designed to transform an empty facility into an integrated refrigerated distribution center, yet much remained to be accomplished.

Plans were designed to turn an empty facility into an integrated refrigerated distribution center, but much was left to be done.

Project Equipment:

  • 64 Industrial Evaporators
  • 5 outdoor machine houses, 2 split temp. (LT & MT), semi-hermetic compressors
  • All control and monitoring systems, all 5 machine houses linked to a central portal
  • 5 Guntner adiabatic gas coolers
  • Stainless steel piping mains, rooftop. XHP coil piping from rooftop isolation valves to coils
  • Underfloor heating system with reclaimed heat from one rack,encompassing freezer and meat cooler spaces.
  • Underfloor PEX system with multiple manifolds, main rooftop heated fluid distribution.
  • Energy saving EC evaporator fan and gas cooler motors
  • 57 compressors 2350 HP
  • 1320 tons capacity at various suction temps.
  • Parallel compression for high ambient peaking

The Solution:

Collaborating seamlessly, the CoolSys engineering, mechanical equipment sourcing, project management, and equipment installation teams joined forces to procure, deliver, install, and calibrate all refrigeration and EMS control systems.

Compressors
0
HP
0
ton capacity
0
SQFT Under-slab heated area
0

The Impact:

The client expressed high satisfaction with CoolSys’ expert teams, So much so that the success of this project pioneered the advancement of CO2 into their design and future portfolio. In addition, it resulted in CoolSys being chosen to undertake several multi-million-dollar CO2 projects.

CoolSys has now been recognized as a key partner for the client’s innovative cold storage initiatives.

Total Square Feet
0
Outdoor Machine Houses
0
Guntner adiabatic gas coolers
0
Industrial Evaporators
0

Related Reading

Everything you need to know about CARB FRIP 2025 program,

The Four Most Common HVAC Repairs in Commercial Heating and

Companies across the country can benefit from the superior commercial

Upgrade EMS: You’re about to lose access to EMS alerts.

Related Reading

Everything you need to know about CARB FRIP 2025 program,

The Four Most Common HVAC Repairs in Commercial Heating and

Companies across the country can benefit from the superior commercial

Upgrade EMS: You’re about to lose access to EMS alerts.

Questions? Need Service?

We're Here to Help

Reach us directly for service requests at 866-417-6586, or fill out the form . Our team is ready to respond swiftly and answer any questions you may have.

Questions? Ready to Get Started?

Let’s Move Forward. Together.

Discover the advantages of aligning with the foremost authority in HVAC and refrigeration services. As a partner steeped in industry knowledge, we’re dedicated to elevating you, your team and your business. Learn More about our acquisition process and benefits, or fill out the form below.

This Website Uses Cookies.

We use Cookies to offer you a better browsing experience, analyze site traffic, personalize content, and serve targeted advertisements. More information can be found here. We do not sell or share your information with any third parties. By continuing to browse Coolsys.com you will consent to our use of cookies.