CASE STUDY
LED Retrofit for a National Retailer Operating Dozens of Banners
An accelerated LED retrofit across 121 stores in six months delivered $5.5 million in annual operating savings for a national food retailer.
READ CASE STUDYSearch pages, insights, and customer stories.

CASE STUDY
When a national discount retailer launched a large-scale store refresh across nearly 17,000 locations, renovation waste and asset removal costs escalated quickly.
CoolSys Facility Solutions deployed a structured asset recovery and beneficial reuse program that reduced landfill impact, improved asset visibility and converted disposal cost into measurable financial return — without slowing renovation schedules.
Large-scale renovation and format changes created:
The retailer needed a solution that reduced cost and waste — without disrupting core operations.
CoolSys Facility Solutions implemented a turnkey, nationwide program designed to eliminate waste and recover value.
Evaluated removed equipment to determine resale and reuse viability rather than default disposal.
Established regional partners to remove assets, repair non-functional equipment and reinstall refurbished assets into secondary retail markets.
Created a structured verification process to establish accurate asset records, improve capital planning visibility and maximize residual value recovery.
Managed execution end-to-end, allowing internal teams to remain focused on store operations and renovation timelines.

The program delivered measurable operational and financial performance improvements, including:
This was not simply waste reduction.
It was structured capital recovery.
Assets Reused
Equipment redirected from landfill or scrap into productive retail use.
Financial Impact
Cost reduction and revenue offset generated through repair and resale.
Hours Saved Annually
Internal time eliminated by outsourcing program management to CoolSys.
Don’t leave money behind during remodels or closures. CoolSys Facility Solutions is ready to streamline end-of-life equipment management across your entire portfolio.
CASE STUDIES
CASE STUDY
An accelerated LED retrofit across 121 stores in six months delivered $5.5 million in annual operating savings for a national food retailer.
READ CASE STUDY →
CASE STUDY
A national emergency cleanout program helped hurricane-affected stores reopen and saved $200,000 in less than one week.
READ CASE STUDY →
CASE STUDY
An LED lighting retrofit across 274 discount stores in four states was completed in 100 days, with a projected 14.5-month payback.
READ CASE STUDY →No case studies match your search. Try another term or select all case studies.