CASE STUDY
Turning Renovation Waste into Measurable Financial Return
A national asset recovery program reused 40,000+ assets, generated $10M+ in financial impact, and saved 19,000+ internal hours annually.
READ CASE STUDYSearch pages, insights, and customer stories.
CASE STUDIES
See how CoolSys helps organizations solve complex refrigeration, cooling, power, and energy challenges through specialized expertise, integrated execution, and lifecycle support.
CASE STUDIES
17 case studies
CASE STUDY
A national asset recovery program reused 40,000+ assets, generated $10M+ in financial impact, and saved 19,000+ internal hours annually.
READ CASE STUDY →
CASE STUDY
Coordinated CO2 refrigeration, hot-gas defrost controls, and field execution supported on-time openings across an accelerated national rollout.
READ CASE STUDY →
CASE STUDY
An accelerated LED retrofit across 121 stores in six months delivered $5.5 million in annual operating savings for a national food retailer.
READ CASE STUDY →
CASE STUDY
A carefully planned refrigeration controls upgrade was completed within 24 hours—10 hours ahead of schedule—at a busy pizza dough facility.
READ CASE STUDY →
CASE STUDY
Integrated CHP commissioning, maintenance, and monitoring helped a data center improve resilience, reduce emissions, and manage energy costs.
READ CASE STUDY →
CASE STUDY
Integrated mechanical, electrical, plumbing, and refrigeration engineering for a 325,000-square-foot meal-production facility in Arizona.
READ CASE STUDY →
CASE STUDY
Turnkey CO2 refrigeration engineering, installation, and controls for a facility with 120,000 square feet of freezer space and a 12,000-square-foot cold dock.
READ CASE STUDY →
CASE STUDY
A national emergency cleanout program helped hurricane-affected stores reopen and saved $200,000 in less than one week.
READ CASE STUDY →
CASE STUDY
An LED lighting retrofit across 274 discount stores in four states was completed in 100 days, with a projected 14.5-month payback.
READ CASE STUDY →
CASE STUDY
Fast-track installation, controls integration, startup, and commissioning delivered a CO2 refrigeration system for a specialty grocery retailer.
READ CASE STUDY →
CASE STUDY
A large transcritical CO2 refrigeration installation supported fresh and frozen food operations at a demanding Hagerstown facility.
READ CASE STUDY →
CASE STUDY
A coordinated refrigerated-case conversion across 153 stores and 14 states kept stores operating and saved approximately $1 million.
READ CASE STUDY →
CASE STUDY
HVAC optimization across an organic food retailer’s portfolio addressed condensation, reduced dew point, and improved store conditions.
READ CASE STUDY →
CASE STUDY
Design-build CO2 refrigeration and controls for a meal kit fulfillment center combined extreme-heat performance with $1 million in capital cost avoidance.
READ CASE STUDY →
CASE STUDY
CoolSys restored CHP performance at a New York City cancer center through maintenance, plant balancing, and continuous remote monitoring.
READ CASE STUDY →
CASE STUDY
CHP commissioning, maintenance, and monitoring strengthened energy resilience for a university village with critical heating and hot-water needs.
READ CASE STUDY →
CASE STUDY
CHP commissioning, optimization, and monitoring improved energy performance and resilience at New Jersey’s Vineland Veterans Memorial Home.
READ CASE STUDY →No case studies match your search. Try another term or select all case studies.
BECAUSE CRITICAL CAN’T COMPROMISE.
Every critical operation has unique demands. CoolSys brings specialized expertise, national resources, and lifecycle support to help you move forward with confidence.