Nationwide CO2 Refrigeration on Accelerated Schedules
Coordinated CO2 refrigeration, hot-gas defrost controls, and field execution supported on-time openings across an accelerated national rollout.
READ CASE STUDYSearch pages, insights, and customer stories.

CASE STUDY
When BSM Construction received approval to build a new Phoenix-area location for a leading specialty grocery retailer, they faced a tight schedule, CO2 refrigeration complexity and a fixed grand opening date that could not shift. They needed a refrigeration partner capable of delivering a full turnkey installation—including a complete Acorn Evac vacuum plumbing system—under fast-track conditions.
CoolSys delivered the entire refrigeration and controls scope, including piping, insulation, rack installation, Hill Phoenix case installation, EMS controls, start-up, commissioning and installation of the Acorn Evac vacuum waste system used for case drainage. Despite delays and shifting timelines, CoolSys kept the project on track and ensured the store opened on time—with record-breaking customer turnout.

BSM Construction required an experienced refrigeration contractor who could:
The retailer did not move their opening dates. The general contractor needed a partner who could handle complexity, absorb lost time and coordinate daily with other trades.
CoolSys was the only partner with the scale, specialized CO2 expertise and operational speed required to execute successfully under these conditions.
CoolSys mobilized just four weeks after award and delivered a complete, integrated refrigeration solution—including the entire Acorn Evac system installation.
The retailer used Acorn’s vacuum plumbing system for case drainage—eliminating the need for traditional plumbing trades. CoolSys self-performed the entire Acorn Evac installation, including:


CoolSys coordinated closely with BSM Construction and all trades, including:
Whenever delays threatened the schedule, the CoolSys team accelerated work—often completing three weeks of installation in one week.
CoolSys delivered a fully functional, finely tuned refrigeration environment—including the Acorn Evac system and full EMS controls—without a single delay to the store’s hard opening date.
Refrigeration piping installed and insulated
Hill Phoenix refrigerated cases installed (medium + low temp), started, tested and commissioned
CO2 rack installed, started, tested, and commissioned
If your project requires speed, precision and end-to-end refrigeration expertise, CoolSys is ready to deliver.
CASE STUDIES
CASE STUDY
Coordinated CO2 refrigeration, hot-gas defrost controls, and field execution supported on-time openings across an accelerated national rollout.
READ CASE STUDY →
CASE STUDY
An accelerated LED retrofit across 121 stores in six months delivered $5.5 million in annual operating savings for a national food retailer.
READ CASE STUDY →
CASE STUDY
Integrated mechanical, electrical, plumbing, and refrigeration engineering for a 325,000-square-foot meal-production facility in Arizona.
READ CASE STUDY →No case studies match your search. Try another term or select all case studies.