The Vineland Veterans Memorial Home in New Jersey is a large-scale facility dedicated to providing long-term care for military veterans, their spouses, and Gold Star Parents. In response to rising energy costs, increasing grid outages, and expanding state incentives for energy efficiency, facility managers began exploring innovative infrastructure solutions.

Their goal: to enhance energy resilience, reduce operational expenses, and align with evolving sustainability standards while continuing to deliver reliable care to their vulnerable residents.

cogeneration solutions CoolSys
cogeneration solutions CoolSys

The Problem

To support the facility’s energy efficiency and resiliency goals, a 555 [kW] combined heat and power (CHP) gas prime mover and a 125-ton absorption chiller were installed.

However, to fully realize the intended performance and operational benefits, the system required further integration, re-commissioning, and optimization. These enhancements were essential to align the system’s output with the facility’s long-term energy and sustainability objectives.

CoGeneration Solutions

To address the facility’s complex energy challenges, safety needs and quality care for residents, CoolSys, as a NJDPMC Classified Contractor, deployed its expert CCHP team to implement a comprehensive strategy focused on system assessment, retrofitting, re-commissioning, and optimization.

This multifaceted approach ensured that the installed equipment could operate at peak performance and align with the facility’s energy, resiliency, safety and sustainability goals. To further enhance financial outcomes, CoolSys supported the facility in securing state incentives.

Today, CoolSys continues to provide 24/7/365 monitoring and proactive maintenance, ensuring sustained operational efficiency, minimizing outages, and preventing performance degradation.

cogeneration solutions CoolSys

Key Actions

Diagnostics & Issue Resolution

CoolSys CoGen specialists performed a comprehensive technical evaluation of the facility’s energy systems, pinpointing key areas for performance enhancement. Through the integration of critical system components, all identified issues were resolved. The installation of a control service module, then optimized to ensure long-term operational efficiency and reliability.

Optimal Commissioning & Plant Balancing

The CHP unit, absorption chiller and control center were calibrated to operate in optimum balance with other critical systems, ensuring seamless operations and maximum energy efficiency.

Preventive Maintenance Implementation

CoolSys introduced a comprehensive preventive maintenance program covering all system components. This included regular inspections, calibration, and predictive replacements to prevent future failures.

24/7/365 Monitoring & Real-Time Response

A central pillar of the solution was the implementation of constant system monitoring to detect and resolve issues as they occurred.

Incentive And Compliance Support

The CoolSys team actively monitors local, state, and federal programs to stay ahead of evolving energy resilience incentives and safety regulations.

cogeneration solutions CoolSys

The Results

The results of CoolSys CoGen’s intervention were transformational for the client organization. By addressing both the immediate and long-term inefficiencies, the center experienced measurable improvements across key performance indicators.

The CHP unit was successfully commissioned, integrating seamlessly with the centralized control system and absorption chiller, which is powered by free waste heat.

This upgrade enabled CoolSys to secure $1.16 million in incentives for the Vineland Veterans Memorial Home from the New Jersey Board of Public Utilities Clean Energy Programs for Commercial and Industrial Energy Efficiency.

Project Highlights

CHP Systems/125-Ton Absorption Chiller

0 kW

Availability on 125-ton Absorption Chiller

0 %+

Incentives Secured

$ 0

Optimal Commissioning

The 557 [kW] CHP system now operates at an impressive 95%+ availability year after year, delivering resilient, efficient, and reliable power to the Veterans Home.

Environmental Impact

By optimizing energy use, the cancer center significantly reduced its greenhouse gas (GHG) emissions by 44%, reinforcing its commitment to environmental sustainability.

Improved Energy Efficiency

The center achieved an 86% reduction in required heating energy. The integration of an absorption chiller improved overall CHP system efficiency by 10–20%, reduced site electricity demand during peak periods, and lowered the need for chilled water production.

HVAC RTU systsems are lower cost

Cost Savings

The energy efficient upgrades resulted in an annual energy cost savings of $590,000. The center reallocated these funds to support critical facility operations and ensure continued investment in essential services.

Energy Saving Assessment-Coolsys

Elevated Resilience

The resilience improvements ensured that during power outages or emergencies, the Veterans Home could maintain uninterrupted operations— to provide critical power for medical equipment, HVAC, lighting, food preparation and safety systems for their vulnerable residents with over 95% availability.

Expansion of Partnership

The success of the project further solidified the client’s confidence in CoolSys. Impressed by the reliability and value delivered, the organization extended CoolSys’ maintenance and monitoring services. The expanded 15-year contract underscores CoolSys’ role as a trusted partner in driving energy resilience.

Equipment Specs

Reduction of GHG Emissions

0 %

Reduced Heating Energy

0 %

Reduction in Costs

$ 0 K

Cogeneration Solutions' Impact

With 24/7/365 monitoring and a 95% system uptime, CoolSys ensures a safe, worry-free environment for all residents—while delivering millions of dollars in energy savings for the Vineland Veterans Memorial Home.

cogeneration solutions CoolSys
cogeneration solutions CoolSys

Let's Discuss Your Next Project

Are you ready to save money, protect your business from outages and reduce GHG emissions for your commercial and industrial business?

Discover the benefits of CHP, CoGen and Multi-Energy Integration Solutions, combining energy efficiency with resilience.

Related Reading

Preventive maintenance Industrial Refrigeration

Cold Storage CO2 Case Study

Cold Storage CO2 Case Study: how CoolSys turnkey engineering, installation, and maintenance solution reduced costs and emissions.

Refrigerated Case Upgrade Case Study: Multi-Store Conversion of Quick-Meal Case for Specialty Food Retailer

Supermarket | Multi-State Partial Remodel Refrigerated Cases Upgrade Across 150+ Stores Multi-Store Conversion of Quick-Meal Case for Specialty Food Retailer

CO2 Refrigeration Case Study: Yosemite Foods

Yosemite Foods Inc., in Modesto, CA, has been providing the highest quality specialty pork products to a diverse array of

Questions? Need Service?

We're Here to Help

Reach us directly for service requests at 866-417-6586, or fill out the form . Our team is ready to respond swiftly and answer any questions you may have.

Questions? Ready to Get Started?

Let’s Move Forward. Together.

Discover the advantages of aligning with the foremost authority in HVAC and refrigeration services. As a partner steeped in industry knowledge, we’re dedicated to elevating you, your team and your business. Learn More about our acquisition process and benefits, or fill out the form below.